  "schema": "glee.research.electricity-reference.v1",
  "edition_date": "2026-10-16",
  "title": "Electricity for Canadian industrial expansion",
  "attribution": "GLEE analysis prepared with OpenAI Codex assistance; primary project observations reported by BC Hydro.",
  "scope": "Source-referenced engineering scale, not national forecast or available supply allocation.",
  "sources": [
    {
      "url": "https://www.bcbudget.gov.bc.ca/Annual_Reports/2025_2026/pdf/agency/bchydro.pdf",
      "sha256": "42c60d15e2afa34e2ee3207d35f8c9cf6665f8e5427b741591017a33886a3cdf"
    },
    {
      "url": "https://sitecproject.com/sites/default/files/SiteC-Semi-Annual-Progress-Report-1-Oct2025-Mar2026_0.pdf",
      "sha256": "30e972968edf01f962277dbd70c2b13d891bc9f01fcca09429dde6f3eb0449fc"
    },
    {
      "url": "https://www.sitecproject.com/sites/default/files/2025_10_30_BCH_SC_LL_EXEC_SMR.pdf",
      "sha256": "c6af55eab0c05c379e1a1367aeb39878cf60d610a0a8fc11f3fd2c65b9552a3b"
    }
  ],
  "reported_actual_energy": [
    {
      "fiscal_year_ended_march31": 2026,
      "reported_year_end_generating_capacity_MW": 1230,
      "reported_actual_generation_GWh": 3574,
      "published_share_of_utility_supply_pct": 4.9,
      "classification": "Reported actual utility statistical table; capacity is year-end,not annual average; generating units were commissioned during these years."
    },
    {
      "fiscal_year_ended_march31": 2025,
      "reported_year_end_generating_capacity_MW": 767,
      "reported_actual_generation_GWh": 1308,
      "published_share_of_utility_supply_pct": 1.9,
      "classification": "Reported actual utility statistical table; capacity is year-end,not annual average; generating units were commissioned during these years."
    }
  ],
  "reported_long_run_average_energy_GWh_per_year": 5100,
  "capacity_definitions": {
    "reported_year_end_statistical_table_MW": 1230,
    "semiannual_installed_range_MW": [
      1100,
      1230
    ],
    "annual_major_capital_table_range_MW": [
      1150,
      1230
    ],
    "minimum_range_difference": "Lower endpoints1100and1150differbetween summaries;not resolved or averaged. Year-endstatisticalpoint1230retained;not a guaranteed continuousoutput."
  },
  "timeline": {
    "construction_start": "2015-07-27",
    "first_generating_unit_in_service": "2024-10-27",
    "final_generating_unit_in_service": "2025-08-08",
    "construction_start_to_final_unit_days": 3665,
    "schedule_boundary": "Ahead-of-schedule statements refer to updatedapprovedschedule;not proof of beatingoriginalbaseline. Fullyoperationalunits do not mean trailingcosts/contractsclosed."
  },
  "costs_as_of2026_03_31": {
    "project_forecast_total_million_CAD": 16000,
    "project_actual_life_to_date_million_CAD": 14917,
    "project_forecast_remaining_million_CAD": 1083,
    "direct_construction": {
      "budget_million_CAD": 11153,
      "actual_life_to_date_million_CAD": 11302
    },
    "indirect": {
      "budget_million_CAD": 2082,
      "actual_life_to_date_million_CAD": 1712
    },
    "construction_and_indirect": {
      "budget_million_CAD": 13235,
      "actual_life_to_date_million_CAD": 13014
    },
    "interest_during_construction_and_contingency": {
      "budget_million_CAD": 2765,
      "actual_life_to_date_million_CAD": 1903
    }
  },
  "cost_basis": {
    "currency": "CAD",
    "price_basis": "Nominal multi-year project accounting amounts;no constant2024CADconversion",
    "scope": "Includes capital,regulatorydeferrals andcertainoperatingexpenditures;forecast includes combinedinterestduringconstruction/contingencyline. Not pure fixedinvestment resourcecost or full lifecyclecost.",
    "FY2025_expenditures_placed_in_service_million_CAD": 13200,
    "placed_in_service_fiscal_year_ended_march31": 2025,
    "placed_in_service_temporal_wording": "in the prior fiscal year; report paragraph is FY2026",
    "placed_in_service_boundary": "Financial transfer into service duringFY2025,not totalLTDprojectcost or a national productivecapitalgain. Exact bridge to other cost fields not established.",
    "recurring_lifecycle_cost": null,
    "residual_value": null,
    "realized_NPV_or_full_LCOE": null
  },
  "load_formula": "generation_MWh = requested_meter_MW * calendar_hours * utilization / (1-assumed_delivery_loss_fraction)",
  "requirements": [
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 100,
      "assumed_utilization": 0.8,
      "assumed_delivery_loss_fraction": 0.0,
      "meter_energy_MWh": 700800.0,
      "required_generation_energy_MWh": 700800.0,
      "required_generation_peak_MW": 100.0,
      "long_run_reference_energy_equivalents": 0.13741176470588234,
      "FY2026_reported_energy_equivalents": 0.19608282036933408,
      "year_end_capacity_equivalents": 0.08130081300813008,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 100,
      "assumed_utilization": 0.8,
      "assumed_delivery_loss_fraction": 0.05,
      "meter_energy_MWh": 700800.0,
      "required_generation_energy_MWh": 737684.2105263158,
      "required_generation_peak_MW": 105.26315789473685,
      "long_run_reference_energy_equivalents": 0.14464396284829723,
      "FY2026_reported_energy_equivalents": 0.20640296880982537,
      "year_end_capacity_equivalents": 0.08557980316645272,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 100,
      "assumed_utilization": 1.0,
      "assumed_delivery_loss_fraction": 0.0,
      "meter_energy_MWh": 876000.0,
      "required_generation_energy_MWh": 876000.0,
      "required_generation_peak_MW": 100.0,
      "long_run_reference_energy_equivalents": 0.17176470588235293,
      "FY2026_reported_energy_equivalents": 0.2451035254616676,
      "year_end_capacity_equivalents": 0.08130081300813008,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 100,
      "assumed_utilization": 1.0,
      "assumed_delivery_loss_fraction": 0.05,
      "meter_energy_MWh": 876000.0,
      "required_generation_energy_MWh": 922105.2631578948,
      "required_generation_peak_MW": 105.26315789473685,
      "long_run_reference_energy_equivalents": 0.18080495356037155,
      "FY2026_reported_energy_equivalents": 0.2580037110122817,
      "year_end_capacity_equivalents": 0.08557980316645272,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 1000,
      "assumed_utilization": 0.8,
      "assumed_delivery_loss_fraction": 0.0,
      "meter_energy_MWh": 7008000.0,
      "required_generation_energy_MWh": 7008000.0,
      "required_generation_peak_MW": 1000.0,
      "long_run_reference_energy_equivalents": 1.3741176470588234,
      "FY2026_reported_energy_equivalents": 1.9608282036933409,
      "year_end_capacity_equivalents": 0.8130081300813008,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 1000,
      "assumed_utilization": 0.8,
      "assumed_delivery_loss_fraction": 0.05,
      "meter_energy_MWh": 7008000.0,
      "required_generation_energy_MWh": 7376842.105263159,
      "required_generation_peak_MW": 1052.6315789473686,
      "long_run_reference_energy_equivalents": 1.4464396284829724,
      "FY2026_reported_energy_equivalents": 2.0640296880982536,
      "year_end_capacity_equivalents": 0.8557980316645273,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 1000,
      "assumed_utilization": 1.0,
      "assumed_delivery_loss_fraction": 0.0,
      "meter_energy_MWh": 8760000.0,
      "required_generation_energy_MWh": 8760000.0,
      "required_generation_peak_MW": 1000.0,
      "long_run_reference_energy_equivalents": 1.7176470588235293,
      "FY2026_reported_energy_equivalents": 2.451035254616676,
      "year_end_capacity_equivalents": 0.8130081300813008,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 1000,
      "assumed_utilization": 1.0,
      "assumed_delivery_loss_fraction": 0.05,
      "meter_energy_MWh": 8760000.0,
      "required_generation_energy_MWh": 9221052.631578948,
      "required_generation_peak_MW": 1052.6315789473686,
      "long_run_reference_energy_equivalents": 1.8080495356037154,
      "FY2026_reported_energy_equivalents": 2.580037110122817,
      "year_end_capacity_equivalents": 0.8557980316645273,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 10000,
      "assumed_utilization": 0.8,
      "assumed_delivery_loss_fraction": 0.0,
      "meter_energy_MWh": 70080000.0,
      "required_generation_energy_MWh": 70080000.0,
      "required_generation_peak_MW": 10000.0,
      "long_run_reference_energy_equivalents": 13.741176470588234,
      "FY2026_reported_energy_equivalents": 19.608282036933407,
      "year_end_capacity_equivalents": 8.130081300813009,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 10000,
      "assumed_utilization": 0.8,
      "assumed_delivery_loss_fraction": 0.05,
      "meter_energy_MWh": 70080000.0,
      "required_generation_energy_MWh": 73768421.05263159,
      "required_generation_peak_MW": 10526.315789473685,
      "long_run_reference_energy_equivalents": 14.464396284829723,
      "FY2026_reported_energy_equivalents": 20.640296880982536,
      "year_end_capacity_equivalents": 8.557980316645272,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 10000,
      "assumed_utilization": 1.0,
      "assumed_delivery_loss_fraction": 0.0,
      "meter_energy_MWh": 87600000.0,
      "required_generation_energy_MWh": 87600000.0,
      "required_generation_peak_MW": 10000.0,
      "long_run_reference_energy_equivalents": 17.176470588235293,
      "FY2026_reported_energy_equivalents": 24.51035254616676,
      "year_end_capacity_equivalents": 8.130081300813009,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    },
    {
      "calendar_year": 2027,
      "hours": 8760,
      "assumed_requested_peak_meter_MW": 10000,
      "assumed_utilization": 1.0,
      "assumed_delivery_loss_fraction": 0.05,
      "meter_energy_MWh": 87600000.0,
      "required_generation_energy_MWh": 92210526.31578948,
      "required_generation_peak_MW": 10526.315789473685,
      "long_run_reference_energy_equivalents": 18.08049535603715,
      "FY2026_reported_energy_equivalents": 25.80037110122817,
      "year_end_capacity_equivalents": 8.557980316645272,
      "admission": "Scale equivalents only. Actual commissioning-year energy and reported long-run average are different measures, not low/high forecasts. Delivery loss is an assumed constant scalar, not a grid flow model. No available allocation or reliable continuous service proved.",
      "national_productive_gain": "UNESTIMATED",
      "household_prosperity": "UNESTIMATED"
    }
  ],
  "shared_resource_examples": {
    "one_GW_fits_nameplate_fails_energy": {
      "arithmetic_status": "OVERSUBSCRIBED",
      "energy": {
        "known_demand_lower_bound": 8760000.0,
        "assumed_limit": 5100000,
        "unknown_project_inputs": [],
        "status": "VIOLATED_BY_KNOWN_DEMAND"
      },
      "peak": {
        "known_demand_lower_bound": 1000.0,
        "assumed_limit": 1230,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "remaining_resource_inputs": "Capital, operating resources, integration and workforce unknown; source pool is hypothetical."
    },
    "high_peak_low_energy_fails_power": {
      "arithmetic_status": "OVERSUBSCRIBED",
      "energy": {
        "known_demand_lower_bound": 1138800.0,
        "assumed_limit": 5100000,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "peak": {
        "known_demand_lower_bound": 1300.0,
        "assumed_limit": 1230,
        "unknown_project_inputs": [],
        "status": "VIOLATED_BY_KNOWN_DEMAND"
      },
      "remaining_resource_inputs": "Capital, operating resources, integration and workforce unknown; source pool is hypothetical."
    },
    "100MW_energy_and_power_fit_other_inputs_unknown": {
      "arithmetic_status": "UNKNOWN_INPUTS_OR_BASIS",
      "energy": {
        "known_demand_lower_bound": 876000.0,
        "assumed_limit": 5100000,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "peak": {
        "known_demand_lower_bound": 100.0,
        "assumed_limit": 1230,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "remaining_resource_inputs": "Capital, operating resources, integration and workforce unknown; source pool is hypothetical."
    },
    "five100MW_shared_pool": {
      "arithmetic_status": "UNKNOWN_INPUTS_OR_BASIS",
      "energy": {
        "known_demand_lower_bound": 4380000.0,
        "assumed_limit": 5100000,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "peak": {
        "known_demand_lower_bound": 500.0,
        "assumed_limit": 1230,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "remaining_resource_inputs": "Capital, operating resources, integration and workforce unknown; source pool is hypothetical."
    },
    "six100MW_shared_pool": {
      "arithmetic_status": "OVERSUBSCRIBED",
      "energy": {
        "known_demand_lower_bound": 5256000.0,
        "assumed_limit": 5100000,
        "unknown_project_inputs": [],
        "status": "VIOLATED_BY_KNOWN_DEMAND"
      },
      "peak": {
        "known_demand_lower_bound": 600.0,
        "assumed_limit": 1230,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "remaining_resource_inputs": "Capital, operating resources, integration and workforce unknown; source pool is hypothetical."
    },
    "100MW_against_commissioning_year_reference": {
      "arithmetic_status": "UNKNOWN_INPUTS_OR_BASIS",
      "energy": {
        "known_demand_lower_bound": 876000.0,
        "assumed_limit": 3574000,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "peak": {
        "known_demand_lower_bound": 100.0,
        "assumed_limit": 1230,
        "unknown_project_inputs": [],
        "status": "WITHIN_ASSUMED_LIMIT"
      },
      "remaining_resource_inputs": "Capital, operating resources, integration and workforce unknown; source pool is hypothetical."
    }
  },
  "measurement_limits": [
    "FY2026includes partial-fleet commissioning;do not call3574/5100an underperformanceestimate or useyearendnameplateforannualcapacityfactor.",
    "No rawmeterdata or independentfieldreplication;utilitystatisticaltable reportedactuals are distinct from auditedfinancialstatement scope.",
    "Project outputalreadyexists inlaterbaselines;not newunallocated2026headroom or a freelyavailableindustrialallocation.",
    "No automatic geographicreplicability,hydrology,firmdelivery,transmission,workforce,rights,environmental orcapitalavailability admission."
  ],
  "national_achievable_gain": "UNESTIMATED",
  "household_prosperity": "UNESTIMATED",
  "verification": {
    "focused_checks": 37,
    "source_review": "Separate-context AI source criticism and dependency reobservation; initial fiscal-period error corrected. Same provider, not independent field replication or peer review.",
    "focused_checks_scope": "Underlying benchmark; public projection checks are separate."
  },
  "shared_resource_units": {
    "energy": "MWh",
    "peak": "MW"
  }
}