An invented pair.
Accepted service, paid hours and declared costs give a reproducible arithmetic example. It is not a measured Canadian effect.
CANADIAN CENTURY / PROSPECTUS & TOOLKIT
Canada’s resources, human expertise, AI, robotics and industry could support a much more productive country. The task is to determine how much—and how that becomes lasting prosperity per person.
Our research follows improvements from the production process through full costs, shared resources and household outcomes. This toolkit makes the first measurement requirements inspectable.
Python 3.10+ · 20.2 KiB · No account or external service needed to run the examples.
01 / The national question
Extraordinary coordination is one proposed route. Ordinary adoption and targeted modernization remain credible alternatives to compare.
We investigate which demonstrated technologies can expand accepted production, what deployment requires and how quickly it can happen. Capital, energy, materials, skills, demand, disruption and recurring costs constrain the result.
More output must be traced through ownership, wages, taxes, transfers and prices. Real disposable income, affordability and household wealth are different outcomes. No achievable national gain or household benefit has yet been established by this work.
GLEE contributes research and engineering. Credibility grows through reproducible results, independent criticism and willing participation.
Read the national research plan →02 / Different evidence, different claims
Historical accounts, engineering observations, planning forecasts and synthetic models answer different questions. They cannot be added into a national gain.
| Evidence | Useful contribution | Next measurement |
|---|---|---|
| National accounting | Historical sector exposure and compatible denominators | Achievable output, costs and displacement |
| Manufacturing energy | Annual physical consumption and conditional intensity arithmetic | Measured process change and regional hourly grid demand |
| Electricity planning | Regional needs under specified resource assumptions | New-load connection, reliability, timing and cost |
| Construction processes | Narrow assembly observations and historical project costs | Matched completed service and all paid work |
| Coordination models | Explicit comparisons of deployment, delay and overhead | Actual additionality against feasible ordinary practice |
03 / Run and challenge the inputs
The standard-library Python tool checks five groups of declarations before calculating conditional descriptive ratios.
SYNTHETIC / COMPLETE
Accepted service, paid hours and declared costs give a reproducible arithmetic example. It is not a measured Canadian effect.
SYNTHETIC / INCOMPLETE
Remove paid factory hours and no comparison is produced. Unknown work cannot become zero in the denominator.
HISTORICAL / INCOMPLETE
Brock Commons supplies useful reference facts. Whole-process paid hours and a matched observed ordinary alternative remain unavailable in this record.
python3 verify.py
python3 production_contract.py examples/synthetic_complete.json
python3 production_contract.py examples/missing_paid_hours.json
python3 production_contract.py examples/brock_reference_incomplete.json
Open a terminal in the extracted folder. The complete synthetic example returns exit 0. The two incomplete examples return exit 3 with a coverage summary and no comparison; that is the expected result. Read the included contract before adapting a record.
Checks cover period, boundary and provenance declarations; accepted service and quality; all paid labour; resource costs; and a feasible ordinary alternative. The package includes 39 distribution, arithmetic and adverse-input checks. The Python tool and field contract retain their reviewed source bytes.
Matching, source kinds and coverage are declarations. The tool does not authenticate records or determine whether those judgments are correct. Complete inputs permit conditional descriptions; causal technology and coordination effects, ROI, national gains and household gains remain unknown.
The construction facts retain original publication URLs and hashes. The publications describe the same project and overlapping research team. They are not independent replications. Publisher PDFs are linked rather than included.
ZIP SHA-256: 37cae3db3b7fe5ee19700ffe50b190de9439627b1ce1fe1f49881018b7a1f4e1
Prepared for GLEE research with OpenAI Codex assistance. Same-provider source and code criticism informs this work; independent field validation is not established.
04 / The next useful evidence
One matched production case needs accepted service and quality, all paid work, full resource costs and a feasible ordinary alternative.
Include design, factory, transport, site work, rework and coordination. Record capital utilization, energy, materials, disruptions and the time needed to deploy. Keep transfers separate from resource costs.
Retain normal capable practice in the baseline. Measure additional deployment, speed or savings alongside overhead and displacement. A bundled improvement alone cannot identify a national coordination effect.
Projects also need evidence about worker outcomes, actual rights holders, environmental effects, privacy, competition and public returns. No institution’s participation, consent or representation is implied by this research.